
Replacement top for Take-off Board
Replacement top surface to fit a steel take-off board. Due to different designs of the metal bases over the years you will need to drill holes to s...
View full detailsReplacement top surface to fit a steel take-off board. Due to different designs of the metal bases over the years you will need to drill holes to s...
View full detailsTimber no-jump board on steel base Two styles: square or sloping Supplied with plasticine
Simply fits on concrete paving and overhangs the sandpit. - Supplied in 1metre pieces - Various colours available - please contact us for deta...
View full detailsWashed White Soft Sand, ideally suited for sand pit landing areas. Price is approximately £100 per ton. PLEASE NOTE: THIS IS A GUIDE PRICE ONLY...
View full detailsMesh cover for long & triple jump pits, with a heavy chain sewn into the seams to keep it in place. - 9.5m x 3.5m (pit size 9m x 3m) - Made...
View full detailsThis horizontal jump trough is the base into which a take-off board is fitted. Requires installation into the ground - please contact us if you re...
View full detailsSoftwood take-off board to be inserted directly into the ground. Please allow 4/6 weeks from receipt of order.
Steel blanking board to fit into the foundation trough for long jump or triple jump take off. Please allow 4-6 weeks from receipt of order.
Full take-off board on a metal base, complete with No-Jump indicator. Please allow 4-6 weeks for delivery from receipt of order.